Al Mosul Right Bank Water Scheme

:
Ministry of Public Works

:
Iraq

:
August, 2007

:
May, 2012

:
Joint Venture

:
Design-Build

:
Total $173 million, El Concorde $103 million

:
Water


:

The project has a capacity of 352,000 M3/day to treat Tigris river water into Domestic water for Mousel Governorate for a total population of 1,548,800 capitals, Scope of work include:
• Low Lift Pumping Station located at Tigris River’s Right bank with a capacity of 368000 M3/day
• Treatment Plant with a net production of 352000 M3/day
• Transmission Pipelines 1500/1200/1000/900/ 700 mm of total about 60 km.
• Elevated Steel tank No.1 (EST1) for storage of treated water with a capacity of 4540 M3
• Elevated Steel tank No.2 (EST2) for storage of treated water with a capacity of 2270 M3
• Boosting Station No.1 (BS1) with a capacity of 13400 M3/Hr
• Boosting Station No.2 (BS2) with a capacity of 8000 M3/Hr
• Raw Water Pipelines, Two lines 1500mm Diameter, 1600 Meters length each
• Treated Water Delivery Pipeline with a total length of 47630 Meters Length with diameters ranging from 600mm to 1200mm