Expansion of Ramtha Wastewater Treatment Plant Works (Turnkey Design and construction Project) with OTV

:
Water Authority of Jordan

:
Jordan

:
May, 2002

:
January, 2005

:
Joint Venture

:
Construction

:
8.9 million $

:
Waste Water


:

• This project will be implemented by the Consortium of El Concorde and OTV (French Film). The Project comprises wastewater treatment plant works with a capacity of 5400 m3/ day, including the design and construction of all civil and building works and the design, supply, erection and commissioning of the mechanical and electrical plant.
• Septage unloading station
• Supplementary parallel headwork's
• Flow equalization/ overflow ponds
• Oil and grease removal chamber
• aeration basins
• Settling tanks, Polishing ponds, and sludge thickening tank and drying beds.