Gaza WWTP, Pump Stations and Storm water

:
Bill Harbert Int’l Construction /USAID for the Municipality of Gaza

:
Palestine

:
April, 1998

:
September, 1999

:
Prime Contractor

:
Construction

:
$ 26.0 million

:
Waste Water


:

• Expansion and upgrading of the existing WWTP, construction of pump stations, force mains, tanks, storm drainage, gravity sewers, road works, in addition to the supply and installation of all related electromechanical works.
• Gravity Sewers (dia. 200 to 1000mm) with total length of 7153m
• Force main (dia. 900 DI, length = 3600m)
• Force main (dia. 450 UPVC, length = 3500m)
• Roadwork’s with 2471m length
• Two pump stations