The project consists of the design and construction of airfield lighting for Runway (R/W) 31/13, parallel taxiway, and related taxi tracks for Mufaq Salti Air Base (MSAB). The project also consists of the demolition of any existing airfield lighting equipment and preparation of a complete and coordinated set of design for construction drawings with required supporting documents and calculations, and construction of fully functional facilities and site improvements as required by contract documents