* High pressure Gas Pipelines 8" from 3 wells to Dehydration Station (about 3 Kms).
* Dehydration / Conditioning Station.
* 16" Gas Pipe Line from Dehydration Station to Metering Station (About 4.5 Kms) with pig Launching / receiving, pipe to the Gas turbine.
* Diesel Network including tank, pump stations and pupelines to gas turbines.
* 30 MW Gas Turbines GE - Frame 6.
* one Substation 132/11 KV, with two transformers 45 MVA.