Supply, Delivery and Construction of Tabaqat Fahel (Pella) II, Water Supply Project

:
Water Authority of Jordan

:
Jordan

:
1997

:
2000

:
Prime Contractor

:
Procurement & Construction

:
$ 10.5 million

:

• the project is supply, install all electromechanical equipment and construct 4 water pumping stations
• 4 Nos. 950 KW 6.6 KV, 625 m3/h @ 360m head pumps for PS-0, 4 Nos. 640 KW 6.6 KV, 576 m3/h @ 235 m head pumps for PS-1, 4 Nos. 880 KW 6.6 KV, 666 m3/hr @ 250m head pumps for PS-2 and 4 Nos. 880 KW 6.6 KV, 666 m3/hr @ 250 m head pumps for PS-3 all complete with all required piping, fitting, pump control valves, isolating valves, Surge control and electrical works such as switchgears, MCC, instrumentation etc.
• 4 complete pumping stations with one water tank and internal piping with all flow meters isolating valves, instrumentation, surge control, etc.